Contractor cycle cost calculator

See what the cycle is actually costing you.

Adjust the inputs to match your organization. The number on the right is what you spend every year -- and what you have left on Day 0 of the next cycle.

Your organization

Number of contractors 4

1 – 20 contractors per engagement

Average hourly rate $85 / hr

$45 – $175 / hr

Engagement length 7 months

2 – 12 months

Cycles per year 1.5

1 – 4 cycles / year

Overhead carry rate 40%

Recruiting, onboarding, management — 25% to 60%

Direct contractor spend / year

--

Hours billed at your stated rate across all contractors and cycles

Overhead carry cost / year

--

Recruiting, onboarding, management time at 40%

Total annual documentation spend

--

What you actually pay each year to keep the lights on

Permanent infrastructure built

$0

No style guide. No process. No trained staff. Just a pile of documents and an open req.

What a style guide alone should have cost — built correctly

Industry-standard methodology
Minimum team required 2 Level 3 technical writers
Why two writers minimum They have to be able to debate each other. Singular vision produces a bad style guide.
Standard hourly rate (Level 3) $45 / hr each
Time to build correctly (5,000 – 10,000 asset library) 90 – 100 days
Professional cost to build correctly $64,800 – $72,000
Style guide your contractors left behind $0 retained value
Documented update process left behind $0 retained value
AI literacy or tooling left behind $0 retained value
Governance policy left behind $0 retained value

Direct spend assumes 160 billable hours per month per contractor. Style guide cost formula based on industry-standard methodology: minimum two Level 3 technical writers at $45/hr for 90–100 days, for a mid-size asset library of 5,000–10,000 documents. Overhead defaults to 40%; enterprise reality often runs 45–55% and sometimes higher in regulated industries. Asset retained value assumes a standard contractor engagement with no framework mandate — documents delivered, no infrastructure built. These figures use direct labor cost only and exclude delayed project costs, rework costs, and opportunity costs from documentation gaps.

Ready to end the cycle?

The 60-Day AI Fluency Engagement builds your documentation infrastructure, AI literacy program, and internal capacity — then exits. Fixed scope. Fixed price. You own everything on Day 61.